Are you a student pursuing an MBA in Production and Operations Management? Are you searching for comprehensive MCQs (Multiple Choice Questions) to help you prepare for your exams? Look no further! In this article, we have compiled a collection of high-quality MCQs specifically tailored to the syllabus of Production and Operations Management for MBA students.
Production and Operations Management pdf for MBA MCQs
1. Information flow at every stage identifies the ___ that are taking place.
Ans. Value additions
2. The quantities of each of the items have to be assessed for ___, ___, ___ and ___.
Ans. Procurement, storage, inspection and receipt
3. Just-in-time and Lean Manufacturing methodologies were developed to ___ the ___ across the organisation.
Ans. Minimise, wastages
4. ___ sets the quantity of each end item to be completed each week of the short-range planning ___, ___ and ___.
Ans. Master Production Schedule
5. ___ is very efficient in incorporating low cost and non-intrusive methods of improving.
Ans. Quality circles
6. ___ and ___ drag the productivity of a manufacturing system.
Ans. Inventory, Breakdown
7. The operations are based on ___, ___ and ___.
Ans. Sequencing, loading and dispatching
8. When the task is performed systematically under ___ and ____ the job gets done better. The purpose of training is to enhance___.
Ans. Supervision and Guidance, performance
9. Mechanisation helps in improving ____, ___ and ___the materials in addition to relieving the monotony of the workers.
Ans. Identification, pick-up, and repacking
10. When multiple zones are covered simultaneously in different zones we call them ___.
Ans. Parallel routing
11. Directives they need have to be ___, ___ and ___.
Ans. Accurate, timely and sufficient
12. Type of storage we provide depends on the average ___ and ___.
Ans. Duration of storage and the frequency of retrieval.
13. Many times ___will not solve some fundamental problems of the basic design of the system, ___ or inappropriate methodologies.
Ans. Mechanisation, inadequate forecasting
14. Sometimes bulk handling ___ systems are used for ___.
Ans. Belt conveyors, sorting and transporting
15. ___ though dependent on pieces per hour or lines per hour will have to be adjusted to suit the peculiarities of the situation.
Ans. Productivity measures
16. ___ should be such that the strategies of different functions are designed to lend support to one another.
Ans. Organisation strategy
17. Features contribute to a large extent in that they address the ___ of the ___.
Ans. Requirement, Customer
18. ___ is mainly concerned with allocating time slots for different jobs.
Ans. Scheduling
19. Tools like ___ are used to make the choice or choices from among many aspects in any one of the above categories.
Ans. Pareto Analysis
20. ____ is resorted to as a measure of identifying strengths in the organisation.
Ans. Internal Benchmarking
21. ___ in the banking sector has resulted in ATMs which save the banks a huge amount of labour.
Ans. Automation
22. ___ receive orders for materials from anywhere in the production area, collect materials and deliver materials to the workstations.
Ans. Automated Storage and Retrieval Systems (ASRS)
23. In ___ where one component is manufactured using several operations and machines it is possible to achieve this condition or very nearly.
Ans. Special purpose machine
24. It is not possible to think of ___ a flow line. ___ cannot be permitted.
Ans. inventories, Bottlenecks
25. ____ are designed so that the assembly tasks are performed in the sequence they are designed.
Ans. Product layouts